• 10 February, 2020 in Ventilation

    Norbert Dentressangle MHRA Chamber

    Atmostherm were asked to provide advice on the design and installation of a new ventilation system to serve…

  • 10 February, 2020 in Renewable Energy

    Work for Change

    The existing gas fired heating boiler at Work For Change, Manchester, was becoming unreliable and costly to…

  • 10 February, 2020 in Plumbing

    Blacon Sheltered Accommodation Block

    Atmostherm were asked to provide advice on the design and installation of a new domestic hot and cold water…

  • 10 February, 2020 in Electrical

    Orthoplastics Ltd

    Atmostherm were asked to provide advice on the design and installation of a new lighting, power, fire alarm…

COVID-19: We are working according to current Government guidelines for our industry

We are maintaining current hygiene & social distancing measures and our engineers are using PPE for their safety and the safety of our customers.